Over the past years we have moved workloads between sites several times — from Moscow to Frankfurt, from Frankfurt to Geneva and back. Every time it seemed that "this one will surely go smoothly". Here is a short list of what actually helps.

Prepare DNS in advance

Lower the TTL of your records a couple of days before the move, not an hour before. It is one of those little things that turn a night migration from an adventure into a procedure. Check beforehand that records update and that old caches do not keep traffic longer than you expect.

Data first, switch later

Replication and checksum comparison first, traffic switch second. Never the other way around. If there is a lot of data, it is worth spending an extra day on background sync rather than an hour explaining why some records were lost. After the switch, compare the counters once more — already at the new place.

Measure from the users

Latency from a data center tells you almost nothing about what people will feel. Test from real access points, not only between servers. We usually keep a few places at hand — a home connection, a mobile carrier, a client's office — and measure from exactly there.

Keep a way back

The old contour must be ready to take the traffic back for at least a week. "We deleted everything because it was all working" is a phrase better left unsaid. A rollback should be a simple action, not a second project.

People and communication

Technology is half of it. The other half is telling people: agree on the maintenance window, write a day before the move, keep the chat open and the on-call person reachable. Clients forgive a night migration; they do not forgive silence.

Migration checklist

  • TTL lowered 2–3 days in advance, records verified.
  • Data replication and checksum comparison complete.
  • Maintenance window agreed, on-call person reachable.
  • A test switch performed on a staging stand.
  • Rollback path tested and documented.
  • Diagrams and addresses updated the same day.

Documentation the same day

The diagram, the list of addresses, the rollback order — all of it is written while it is fresh in memory. A month later nobody will remember why it was decided that way, and in two months — why anything was touched at all.

A migration is not only technology. It is also peace of mind. The more boring the move, the better it was done.